|
Several linear cracks were found on the slab at a
telephone switching facility in Tennessee. The plan
specifications required a certain minimum slab thickness
at this facility that housed several racks of batteries,
each weighing approximately 300 lbs. Ground
Penetrating Radar evaluation of the slab in a number of
the battery-holding rooms was required to provide
information as to the cause of the failure. |